The plumber said it'd be a matter of replacing a section of pipe, 250-500$. (Presumably plus more of that to replace the flooring where they pull it up.) He doesn't think it's anything worse than that, and all the rest of the piping looks good.
MM, and I did ask him to give me a worst case, whole floor needs to be re-piped estimate, and that was still within our budget, albeit stretching it and then we wouldn't be able to do all the small repairs we want to within the first six months. But he doesn't think it'll come to that.
(no subject)
Date: 2012-03-21 04:33 pm (UTC)MM, and I did ask him to give me a worst case, whole floor needs to be re-piped estimate, and that was still within our budget, albeit stretching it and then we wouldn't be able to do all the small repairs we want to within the first six months. But he doesn't think it'll come to that.